Gabala Futbol Club
az en
 
Home Page Contacts Links
 
 
  Stadion
   
    Tournament schedule
 
 
     
 
Gabala Сity Stadium was constructed attached to Tobacco Factory in 1985. The area is 6 hectares. There are little training fields in the stadium together with the basic one. The restoration of the stadium has started since 2005. Plastic seats were set up and the seating capacity of the stadium became 2,000 in that period. And meantime the pitch was also renewed. The cloak-rooms that meet modern standards, artesian wells for to solve water problem, and gyms for the football players were started to be used in 2006. It has been decided to have through repairs for the stadium since 2007. And for this purpose the construction of the subsidiary pitch next to the main pitch has started. After the subsidiary pitch is ready, the main pitch will be closed for construction in accordance with the European standards. The pitch will be changed, stand and elector indicator board will be installed. Artificial pitches will be constructed in parallel.

At present 11 persons work in Gabala City Stadium. The Stadium director is Arif Bakhishov. 

 

 
   
 
   

 

                 

 

  Club M V D L D P  
1   Karabakh 15 10 3 2 16-8 33  
2   Inter 15 9 3 3 26-15 30  
3   Kh.- Lan. 15 8 5 2 21-8 29  
4   Baku 15 8 2 5 16-14 26  
5   GABALA 15 7 5 3 19-16 26  
6   Simurg 15 7 5 3 18-13 26  
7   Neftchi 15 7 4 4 16-12 25  
8   Olimpic-Sh 15 4 4 7 16-18 16  
9   Mukhan 15 3 4 8 10-21 13  
10   Turan 15 3 3 9 18-23 12  
11   Standard 15 1 3 11 13-26 6  
12   Karvan 15 1 3 11 10-24 6  

    Strikers  

    Next match date

 
         
  F.Hatami 3  
  K.Kerimov 3  
  R.Amirguliyev 3  
  I.Svetkov 3  
 
   
Khazar Lankaran | Gabala

  Tournament: Premier League
  Date: 12.03.2010
  Time:14.00
  Place:Lankaran stadium
 
           
 
Copyright © 2008. Qəbələ Peşəkar Futbol Klubu Design by Rashad & Latif